New commissioning in Uzbekistan.

New commissioning in Uzbekistan.

In September of 2017 in Uzbekistan we have tested and commissioned a new automatic plant for pre-treatment and powder coating of components for electrical cabinets.
This plant consists of:
– tunnel for chemical pre-treatment (5 phases) with equipment for the control of the baths and automatic dosing of chemical reagents,
– water treatment plants (deionizing units and wastewater treatment),
– automatic powder coating booth with cyclones recovery,
– polymerization oven
– monorail conveyor.
The tests showed good results.