Loading

SEMIAUTOMATIC POWDER COATING PLANTS

Include:

  • Pretreatment tunnel or washing booth
  • Spray booths of various types
  • Static oven
  • Manually operated conveyors with a load capacity of up to 5,000 kg per trolley, with automatic mover in individual zones,
  • Powder coating equipment (automatic and/or manual)

Such systems guarantee maximum flexibility and are the optimal solution for companies that need to paint both small and large-sized products of various configurations, without the need for high constant productivity.

Here are some examples:
 

Example 1: Semiautomatic powder coating plant for agricultural machinery

Product passage opening:

  • Height - 2,900 mm
  • Width - 2,200 mm
  • Product length - 12,500 mm
  • Max load capacity on traverse - up to 1,400 kg

Working cycle:

  • Manual shotblasting and/or chemical surface treatment:
    • Degreasing
    • Pass-through rinse
    • Rinse
  • rinse - Activation - Zinc phosphating - Rinse - rinse with deionized water
  • Drying
  • Powder coating
  • Polymerization
  • Cooling/Unloading of products from the conveyor

The plant consists of:

  • 9-phase pretreatment tunnel (with oil separators for degreasing phases, an automatic control and dosing station for chemical products for active phases, a filter press for the zinc phosphating tank))
  • Drying oven after chemical treatment
  • Manual powder spray booth with filter recovery (with filter groups for 3 main colors), equipped with manual spray guns
  • Static polymerization oven
  • Overhead conveyor with manual movement and automatic movers (for the tunnel and drying zones)
  • Control panel with touch screen
  • Deionizing plant
  • Reverse osmosis system (for filling all tanks with osmotic water)
  • Wastewater treatment plant
  • Manual shotblasting booth with automatic abrasive recovery

Example 2: Semiautomatic powder coating plant for large-sized products (for third-party customers)

Product passage opening:

  • Height - 3.000 mm
  • Width – 3,000 mm
  • Product length – 13,000 mm
  • Product weight – up to 3,000 kg

Working cycle:

  • Automatic shotblasting
  • Painting with powder or liquid paints
  • Polymerization/paint drying 30 min at 180-220°C
  • Cooling / Unloading of products from the conveyor

The plant consists of:

  • Automatic shotblasting booth with automatic abrasive recovery
  • Manual powder painting booth with filter recovery
  • Manual liquid painting booth with dry filtration
  • Drying/polymerization oven
  • Semiautomatic conveyor with two automatic lifts
  • Control switchboard

Example 3: Semiautomatic powder coating plant for frames (modules for modular buildings)

Product passage opening:

  • Height - 3,700 mm
  • Width - 800 mm
  • Product length - 7,500 mm
  • Product weight - up to 1,000 kg

Working cycle:

  • Shot blasting and/or chemical surface pretreatment
  • Automatic powder coating
  • Polymerization

The plant consists of:

  • Manual shot blasting booth with automatic abrasive recovery
  • 2-phase stainless steel pretreatment tunnel
  • Drying oven
  • Automatic powder spray booth with cyclones, complete with:
    • Vertical manipulators
    • Automatic and manual spray guns
    • System for reading piece sizes in height
  • Polymerization oven
  • Overhead semiautomatic conveyor: with two zones for manual movement and the movers for automatic movement in the areas of chemical treatment, drying, painting, and polymerization.
  • Control switchboard

Automatic powder painting plants

Automatic powder painting plants

Semiautomatic powder painting plants

Semiautomatic powder painting plants

Liquid painting systems

Liquid painting systems